Week 21: final bits and finishing touches! Most of the lights are in, though a couple special ones aren’t arriving until next month. Painting is 95% done, and how lovely is our bedroom wall now!? In the living room you can see how the bulkhead matches the curve of the lower shelf. The accordion screen for the French doors looks great too. I’m really excited to have A/C in our offices, and power points with USB charging built in! The fancy Japanese toilet is being installed, as well as the heated towel rail. (I can’t wait to try out the bath.) Back security door is on too. Not much left to do before we can move in… #renovation 🏠
Blog post: Now that I have to pay for my own mobile phone plan, I ditched my Telstra contract and went for something a lot cheaper!
Blog post: Every night before bed we’ve been doing a handful of puzzles to keep our brains sharp. Any recommendations? (DON’T SAY WORDLE.)